Trackwork gets a much needed overhaul.
After yet another summer away from the loft, I'm back in the harness again. I've been working to properly electrify the depot sidings and upgrade the switches. Switch machines and controls are being installed to facilitate something akin to proper operation. I'll be very glad when I've finished as I loathe trackwork more than anything on the layout!
I was waiting on a new capacitance discharge unit, which arrived today, so will hopefully have the switch machines live tomorrow. Then the fun can commence. The turntable needs to be wired up but will not be motorized in the short term.
I put some simple ground cover over the bare boards and look forward to some proper modelling to follow.